Theme

Build

Websites and Custom Apps

Bonzai’s web development turns the way your business already works into fast software: a search-ready website your own team edits, live in a week, or a custom app, CRM or client portal in 30 days, built on open source so you own every line.

Every extra second, someone taps back. 1 The search; 2 The wait; 3 The next result.

Why this matters

Your website may be quietly costing you customers

“1.0 second is about the limit for the user’s flow of thought to stay uninterrupted, even though the user will notice the delay.”

Jakob Nielsen, Nielsen Norman Group, summarizing Miller (1968) and Card et al. (1991). Response Times: The 3 Important Limits, NN/g

Most small-business websites do not fail loudly. They fail in the few seconds between a search and a page that finally appears, and nobody on your team ever sees it happen. Here is that moment from your customer’s side, in three steps.

Someone nearby types what you do into Google, usually on a phone, often while standing in the problem: the AC is out, the deadline is Friday, the quote is due. Your listing shows up. That is the expensive part, and it is already done: the reviews, the years in business, the work it took to rank. The next few seconds decide whether any of it pays off.

2. The wait: where customers quietly leave

They tap your result and get a blank screen. Google’s research with SOASTA found that as page load time goes from one second to ten, the probability of a mobile visitor bouncing rises 123% (Think with Google, archived). The BBC found it lost an additional 10% of users for every additional second its site took to load (web.dev). Jakob Nielsen’s long-standing rule is that about one second is the limit before a person’s train of thought is interrupted.

The cost of a slow page

Conversion rate falls with every second of load time

½Above a 5-second load, roughly half the conversion rate of a fast website.

Average goal-conversion rate (such as a contact form) by page load time. Source: Portent, Site Speed is (Still) Impacting Your Conversion Rate, 2022, 100M+ page views across 20 B2B and B2C sites.

Small gains still count. In Deloitte’s study for Google, a 0.1-second improvement in mobile site speed came with 8.4% more retail conversions, 10.1% more travel conversions and an 8.3% better bounce rate on lead-generation pages (Deloitte, Milliseconds Make Millions).

3. The next result: your competitor’s easiest win

Nobody waits politely. They tap back and choose the next listing, which loads before they finish deciding. Portent’s study of more than 100 million page views found that a B2B site loading in one second converts at three times the rate of one loading in five (Portent). The customer never tells you they left. They just never call.

How Bonzai closes the gap

Picture a typical small-business site. It was built years ago on a theme and a stack of plugins. Nobody remembers the login. Every update breaks something, so nobody updates it, and it gets slower every year.

We stopped building on WordPress in October 2026 for exactly that reason. Every plugin is code someone else wrote, on a server someone has to keep patched. We build on Next.js and Payload CMS instead: no plugin sprawl, pages that load fast, and your website and your apps in one codebase. Here is the honest trade-off: a custom stack needs a developer who knows it. That is the job we sign up for.

It is also why our builds are quick. Innovative Heating & AC got 6 service pages and 38 service-area pages, every old address redirected, in two days. CCHMG moved to a bilingual site in three. And when a spreadsheet or an off-the-shelf CRM is the real bottleneck, we build the app instead: M Cubed Technologies had a working demo of its whole workflow seven days after the project started.

Three layers. One codebase. Yours to keep.. 1 Pages and search; 2 The CMS your team uses; 3 Logins, payments, signing.

What you get

Everything your customers touch, built as one system you own

A Bonzai website is a search-ready public site your own team can edit, live in a week, with every old address redirected before launch. A custom app, CRM or client portal is the same stack, shaped around how you already work, typically in 30 days. Think of it as three layers that share one codebase.

Pages and search: the layer customers and Google see

Fast pages built from real text, not images of text, with structured data, a clean sitemap and every old address mapped to a new home. Bilingual pages and phones are not an afterthought.

The CMS: your team edits content, not the layout

Payload CMS gives your team fields shaped like your content: a headline, a service, a phone number. They can preview a change before it goes live, and nobody can drag the design out of shape by accident.

Logins, payments and signing: the app layer

When the work needs it, the same codebase grows into a client portal, a CRM or a staff tool, with logins, booking, payments and e-signing built in. One system, instead of a website plus five subscriptions that do not talk to each other.

If you like how the current site looks, we can move it to this stack and keep the look pixel for pixel, then improve it over time. You are not buying a redesign you did not ask for.

  • Websites, live in one week, editable by your team
  • Custom apps and CRMs in 30 days
  • Client and staff portals with their own logins
  • Booking, payments and e-signing built in
  • WordPress sites moved to a modern stack, every old address redirected
  • Bilingual sites, and pages that work on every device
  • Built on open source: nothing to license, and you own it
Your launch, day by day. 1 Map what you have; 2 Design or a working demo; 3 Build in the open; 4 Launch and hand over.

How a build runs

See your design on day 3. Go live on day 7.

You see working software early, while changes are still cheap. No disappearing for six weeks, no big reveal you cannot change. Four steps, each with something you can look at.

1. Map what you have

We start with your brief, your content, and every address your old site still answers on, pulled from its sitemap and Search Console, so nothing that ranks today gets lost.

2. Review a design, or click a working demo

For a website, you review the design on day 3, before it is built. For an app, you click through a working demo in week 2, with your own workflow in it.

3. Build in the open

Every change gets its own preview link before it reaches your live site, and any release can be rolled back. You always know what is about to change.

4. Launch and hand over

At launch: every old address redirected, your data loaded, logins for your team, and a walk-through so they can edit pages themselves. The stack is Next.js and Payload CMS on Vercel, with Neon Postgres, the same stack Bonzai uses for its own site. See the full process, and your client portal.

Typical timelines for Websites and Custom Apps
ProjectTypical timelineWhat shapes it
Website1 weekBrief and content, design to review, build with redirects, live on day 7.
WordPress replacement1 weekYour site moved to a modern stack, every old address redirected.
Custom app, CRM or portal30 daysMap how you work, working demo in week 2, your data and logins, team using it by day 30.
Good, needs work, or poor: where does your site land?. 1 Loading (LCP); 2 Responsiveness (INP); 3 Stability (CLS).

What good looks like

The three speed scores Google watches, and how we build for them

“We highly recommend site owners achieve good Core Web Vitals for success with Search and to ensure a great user experience generally.”

Google Search Central, Understanding Core Web Vitals and Google search results. Understanding Core Web Vitals and Google search results, Google

A good business website is not a brochure that happens to have a URL. It is a page people can use on the phone they already have, that your team can update without breaking the layout, and that keeps the addresses Google already knows. Speed is the part you can measure, and Google publishes the bar.

Core Web Vitals

Google’s bar for good, needs work and poor

Judged at the 75th percentile of real page loads, on mobile and desktop. Source: web.dev, Web Vitals.

Loading (LCP): show the main content within 2.5 seconds

Largest Contentful Paint is the moment the biggest thing on screen, usually the headline or hero image, finishes appearing. Good is 2.5 seconds or less; poor is more than 4 seconds (web.dev, LCP). We size images, preload the hero and keep scripts off the critical path so a mid-range phone has a chance to pass.

Responsiveness (INP): answer every tap within 200 milliseconds

Interaction to Next Paint measures how long the page takes to visibly react after a tap, click or key press. Good is 200 milliseconds or less; poor is more than 500 (web.dev, INP). We keep heavy libraries out and do the work on the server, so a menu opens when it is tapped.

Stability (CLS): nothing jumps while they read

Cumulative Layout Shift scores how much the page moves around while it loads, like the button that jumps just as you tap it. Good is 0.1 or less; poor is more than 0.25 (web.dev, CLS). We reserve space for every image, font and embed before it arrives.

All three are judged at the 75th percentile of real visits, on mobile and desktop (web.dev, Core Web Vitals). A good site also stays fast after the first load. App-like pages spend most of their life in clicks that do not reload the document, and as of 17 November 2026 Vercel Speed Insights records LCP, INP and CLS on those soft navigations too (Vercel changelog). We treat the whole visit as the thing to measure.

Ownership and editing

Your team should be able to change a headline, a service, or a phone number without waiting on us and without dragging a layout out of shape. You should own what you pay for, on open-source software, with nothing extra to license. And on launch day, every old URL should already have a new home.

+123%

Rise in the probability of a mobile visitor bouncing as page load time goes from one second to ten.

Source: Think with Google, Google/SOASTA Research 2017 (archived)

3×

A B2B site that loads in 1 second has a conversion rate three times higher than one that loads in 5 seconds.

Source: Portent, 2022 (100M+ page views, 20 sites)

+8.4%

More retail conversions after a 0.1-second improvement in mobile site speed.

Source: Deloitte for Google, Milliseconds Make Millions

1.0s

About the limit for a person’s flow of thought to stay uninterrupted, even when they notice the delay.

Source: Jakob Nielsen, Nielsen Norman Group
Three ways in. Start with the one that pays first.. 1 Website; 2 Custom app or CRM; 3 Move off WordPress.

Decision guide

Start with the bottleneck, not the wish list

You do not have to buy everything at once. The right first project is the one that removes the bottleneck you actually have.

Start with a website if

  • People need to find you, understand the work, and get in touch or book.
  • Your current site is slow, hard to edit, or missing on phones.
  • You already have a way to manage customers, and the public site is the gap.

Start with an app, CRM or portal if

  • The real work lives in spreadsheets, inboxes or a tool you cannot shape.
  • Clients or staff need their own logins, or you need booking, payments or e-signing in the same place.
  • A website alone would still leave the team retyping the same record.

Move off WordPress if

  • Updates scare you, or a plugin break has already taken the site down.
  • You want the public site and the internal tools in one codebase, with previews and rollbacks.
  • You like the look (we can keep it) but not the server and the plugin stack underneath.

If a budget cannot cover the full request at once, we can still map the whole project and start with a launch phase. Your exact path and price come from the live estimate or a short call. We do not promise search rankings.

  1. Lost URLsOld addresses turn into dead ends
  2. Layout anyone can breakA page builder lets the design drift
  3. Only the first load is measuredLater clicks slow down unseen
  4. A theme stretched into a productPlugins pile up; updates stop
  5. No hand-overNobody can edit, so it goes stale
Where redesigns leak customers. 1 Lost URLs; 2 Layout anyone can break; 3 Only the first load is measured; 4 A theme stretched into a product; 5 No hand-over.

Pitfalls

Five ways a new site throws away traffic you already earned

A new site can look finished and still fail at the jobs that pay for it. These are the problems we plan for on purpose.

  • Launching without a redirect map. If a page used to answer at an old address, and that address now 404s, you have spent money to hide work you already paid to rank.
  • A page builder that lets anyone with a login drag the layout around. Editing should feel like filling in fields, not dismantling the design.
  • Judging speed only on the first document. If the rest of the visit is a web app, those later clicks need to stay in the same “good” range.
  • Hoping a theme plus plugins will become a product. That path is how sites get stuck on updates, and how a public site and an internal tool end up as two problems instead of one system.
  • Going live before the team has had a walk-through. If nobody on your side can change a page, the site starts going stale on day two.
What it runs onA PHP server and a stack of pluginsNext.js and Payload CMS, hosted on Vercel with Neon Postgres
Who can edit itA theme or page builder that is easy to breakYour team edits fields shaped like the content, without changing the layout
Old addressesOften left as 404s after a redesignEvery old URL is listed and redirected before launch
Typical timelineVaries widely by theme, plugins and hostA website live in 7 days; a custom app, CRM or portal in 30 days
Who owns itThe site depends on plugins you may not controlYou own what you pay for, on open-source software with nothing to license
Under the hood, side by side. 1 The old stack; 2 The Bonzai stack.

Compared

Plugins patched forever, or a stack you own

This is how we build, not a claim about every WordPress site. We stopped building new WordPress sites in October 2026 and move existing ones to this stack when you are ready.

A modern stack, compared with a typical WordPress site
Typical WordPress siteHow Bonzai builds it
What it runs onA PHP server and a stack of pluginsNext.js and Payload CMS, hosted on Vercel with Neon Postgres
Who can edit itA theme or page builder that is easy to breakYour team edits fields shaped like the content, without changing the layout
Old addressesOften left as 404s after a redesignEvery old URL is listed and redirected before launch
Typical timelineVaries widely by theme, plugins and hostA website live in 7 days; a custom app, CRM or portal in 30 days
Who owns itThe site depends on plugins you may not controlYou own what you pay for, on open-source software with nothing to license

This is how we build, not a claim about every WordPress site. We stopped building new WordPress sites in October 2026 and move existing ones to this stack.

Website$2K – $6K

Live in 7 days

Web application$8K – $30K

In use in 30 days

CRM$5K – $20K

In use in 30 days

Published ranges from Bonzai’s price table. Your exact figure comes from the estimate.

From a published range to your exact number. 1 The published range; 2 Your estimate; 3 The timeline.

Costs and timelines

Real price ranges, published before you ever call

The figures on this page are the published ranges from Bonzai’s price table, not a custom bid. Monthly care, if you want it, is a separate monthly fee. Your exact price and timeline come from the live estimate or a short call.

Typical timelines for Websites and Custom Apps
ProjectTypical timelineWhat shapes it
Website1 weekBrief and content, design to review, build with redirects, live on day 7.
WordPress replacement1 weekYour site moved to a modern stack, every old address redirected.
Custom app, CRM or portal30 daysMap how you work, working demo in week 2, your data and logins, team using it by day 30.
  1. Core Web VitalsLoading, responsiveness and stability, judged on real visits
  2. Server-rendered pagesFast first loads that search engines can read
  3. Soft navigationsMeasuring the clicks after the first page, too
Sourced, dated, and already in our builds. 1 Core Web Vitals; 2 Server-rendered pages; 3 Soft navigations.

What we follow now

What is working in 2026, straight from the source

The tactics below are from official pages we fetched on 22 November 2026, and from how they show up in our work. They are not a promise that every page will pass every threshold on every phone.

What current official guidance says, and how it shows up in our work. Linked to the pages we fetched on 22 November 2026.

Budget for Core Web Vitals from the first design

Google’s current “good” thresholds are LCP within 2.5 seconds, INP of 200 milliseconds or less, and CLS of 0.1 or less, judged at the 75th percentile on mobile and desktop. We size images, reserve space for media and keep scripts off the critical path so the page has a chance to pass on a mid-range phone.

web.dev, Core Web Vitals (updated 31 October 2024; still the published thresholds in 2026)

Render on the server, then refresh on a timer

Next.js now recommends Cache Components so pages can mix a static shell with request-time data. We already pre-render pages and rebuild them on a short timer, so visitors get a fast first load and your team’s edits still show up without a full redeploy.

Next.js 16.4, 6 October 2026

Measure the clicks after the first load

App-like sites spend most of their life in client-side navigations. As of 17 November 2026, Vercel Speed Insights records LCP, INP and CLS on those soft navigations too. We treat the whole visit, not only the first document, as the thing to measure.

Vercel changelog, 17 November 2026
  • Open sourceYou own the code
  • Day 3A website design to review
  • Week 2An app demo you can click
Straight answers before you spend a dollar.

FAQ

Websites and custom apps: straight answers

What do you build websites and apps with?

Next.js and Payload CMS, hosted on Vercel with a Neon Postgres database, plus Vercel Blob for media and Resend for email. It is the same stack this site runs on.

How fast can you build a website?

A website is typically live in one week: brief and content, a design to review on day 3, the build with redirects, and launch on day 7. Custom apps, CRMs and portals are typically in use in 30 days.

Do we own the code?

Yes. Everything is built on open-source software with nothing to license, so you own what you pay for.

Why not WordPress?

Plugins and the PHP server under them are where most WordPress sites get attacked, and they slow pages down. A modern stack removes both. The trade-off is that you rely on a developer who knows the stack instead of a plugin marketplace, and we are that developer.

Can you build a client portal or an internal tool?

Yes. Portals with their own logins, internal operations apps that replace spreadsheets or an off-the-shelf CRM, booking, payments and e-signing are all things we have built for clients.

What do you need from us before a build starts?

A brief, the content you already have, logos and any brand rules, and a list of the addresses your current site still answers on. If you have Search Console, that list is easier to complete. We can help you gather it.

Will we lose our place in Google if we move?

We list every old address and redirect it before launch, so people and search engines can still find the work. We do not promise rankings, traffic or a place in AI Overviews.

Can our team edit the site after launch without breaking the layout?

Yes. Your team edits fields shaped like the content. Changing a headline or a service should not mean dragging the design apart. We walk you through it at hand-over.

  • Our workOnly live cards already on /work
  • MonthlyThe latest-news list is refreshed by hand
Shipped work, and what we are reading. 1 Related work; 2 Latest in this category.

Work and what’s new

Proof, not promises: work that is already live

We only link to Our work cards that are already live, and only describe them the way that page already does. The “Latest in …” list is a curated set of recent articles, dated, with outbound links. It is checked about once a month.

Recent guidance we are reading on performance, caching and how pages should feel. Refreshed by hand; last checked 22 November 2026.

Related services

Works best with

Next step

Talk it through with Bonzai